DOING icona

“PUSH ‘O VER” – Full-scale testing, beyond numerical simulations

Research project for full-scale experimental verification of modern anti-seismic technologies for the strengthening of masonry buildings.

The project

The “Push ‘o ver” Project is a research initiative aimed at testing, in the field, the effectiveness of modern anti-seismic technologies for upgrading masonry buildings. The name, with a playful Anglo-Neapolitan twist, can be read as “push for real”, highlighting the ambition to go beyond numerical simulations and move towards full-scale testing.

Born from the collaboration of three engineering firms – DOING Ingegneria, EAS Ingegneria and Di Emidio Progetti – the project involved several key partners, including:

  • Impresa Edile Gaspari Gabriele Srl of Ascoli Piceno, responsible for demolition and reconstruction works
  • Fibre Net S.p.A. of Pavia di Udine, which supplied the CRM system for seismic strengthening and the measurement instruments
  • CMP Srl of Osimo, which built the steel reaction frame for the loading system
  • University of Camerino and ENEA, which provided technical and scientific support, monitoring and interpreting the building’s behaviour during the tests

Full-scale field testing

For the real push-over tests, a masonry building in the Municipality of Castel di Lama (AP), damaged by the 2016 earthquake, was used as a case study. The building was divided into two portions:

  • one strengthened using the CRM system for seismic upgrading
  • the other repaired with more traditional retrofit techniques

Dynamic tests and full-scale push-over tests were carried out up to collapse to assess the effectiveness of the strengthening strategies. The results showed a significant improvement in the seismic performance of the reinforced portion of the building.

For further details: progettopushover.it

VIEW FIRST PUBLICATION
VIEW SECOND PUBLICATION
VIEW THIRD PUBLICATION

Video

See other projects

Technical and economic feasibility design, detailed design and health and safety coordination during..

Hydrological / hydraulic study – detailed / final design – construction supervision –..

Hydrological / hydraulic study – detailed / final design – health and safety..

Menu