Demolition and reconstruction of a semi-detached villa severely damaged by the 2009 earthquake, rebuilt with a mixed timber–concrete structural system.
Demolition and reconstruction of a semi-detached villa severely damaged by the 2009 earthquake, rebuilt with a mixed timber–concrete structural system.
The project involves the demolition and reconstruction of a semi-detached villa that suffered major damage in the 2009 earthquake, using a mixed timber–concrete load-bearing structure.
The new building has been redesigned with a substantially different internal layout to optimise space through modern, flexible and functional solutions. Particular attention has also been paid to improving the building’s energy performance.
Hydrological / hydraulic study – detailed / final design – health and safety..
Research project for full-scale experimental verification of modern anti-seismic technologies for the strengthening..
Hydrological / hydraulic study – detailed / final design – construction supervision.
..