Di Emidio Icona

Feasibility study for a road and pedestrian railway underpass

The study concerns the construction of a new railway underpass in an area between the state road SS16 and a currently inaccessible stretch of shoreline. The project envisages a combined road and pedestrian underpass providing direct access to the beach, particularly for emergency vehicles and goods loading/unloading vehicles—an access route that is currently missing for such traffic within the Marina di Altidona district.

The project

The feasibility study focuses on the design of a new railway underpass located between the SS16 state road and a non-accessible beachfront area.

The proposed solution is a road and pedestrian underpass that will create a direct connection to the beach, with particular benefits for emergency services and vehicles for goods loading and unloading. At present, no such connection exists for these vehicles within the Marina di Altidona area, making the project a key intervention for accessibility, safety and local logistics.

Video

See other projects

Refurbishment and fit-out of a small hospitality facility located on the 5th floor..

Conventioned development area, Zone E1 of the “Acqua Acetosa Ostiense” Master Plan, Sector..

SUB-MEASURE A.2.1 “Functional upgrading, energy efficiency improvement and seismic vulnerability mitigation of public..

Menu